background image

10

 

INTELLIFLO

® 

Variable Speed Pump Demo Kiosk Operation and Set Up Instructions 

Water Fill and Priming

1.  Be sure the Flow Valve on discharge piping is 

OPEN (lever 90° to pipe).  

2.  Add water to the system by removing the top lid 

of the pump and filling the pump stainer basket 
with water. 

3.  Add water until the water level in the tub is 2” to 

3” from the top lip. Securely fasten the lid after 
the tub is full.

4.  Check the water level periodically - water can 

evaporate over time. Be sure the water level in 
the tub is at least half full. 

Start Up Sequence

Valve Open

Valve Closed

IMPORTANT! READ BEFORE TURNING ON THE PUMP

Pump can draw up to 3000 watts of power during priming and start up (typical 120V 20 Amp circuit 
is limited to 1800 watts maximum). Check to be sure the pump watt and power usage does not 
exceed the rated capacity of the electrical outlet.
For continued, safe operation, 

the pump’s maximum speed has been set to 2800 RPM prior 

to shipment. It is recommended that the maximum speed not be changed. Do not change preset 
maximum pump RPM without contacting an authorized Pentair representative.

DO NOT ADD ADDITIONAL WATER 
AFTER THE INITIAL START-UP. 

Water in pipes could drain downward and cause an overflow 
into the water tub and cabinet.

1.  Switch ON the transformer (red light means 

power is on). Be sure switch on power strip is 
ON. 

2.  Switch the DAQ-202 “Black Box” Unit ON. The 

keypad will light up on the pump. 

3.  Be sure to read important instructions above. 

Turn the pump ON. (Press Stop/Start button on 
pump keypad). Keep finger on the Stop/Start 
button and look for any sign of leaking water. If 
this occurs, press the Stop/Start button to turn 
the pump off. 

4.  Look inside the kiosk and inspect flexible 

connections for leaks. If leaks are found, tighten 
loose connections, and resume start up. 

5.  Turn the monitor ON (

Note: Turn on monitor 

before turning on the computer).

6.  Turn the wireless mouse ON.

7.  Turn on computer. The computer should 

automatically boot up into pump start up screen. 
If LCD monitor screen does not display in full 
screen, verify screen settings are set to 1440 x 
900.  (See troubleshooting on page 14 for more 
information). (Note: only applies to earlier demo 
units that used a laptop).

START UP AND OPERATION

Summary of Contents for IntelliFlo

Page 1: ...INTELLIFLO VARIABLE SPEED PUMP LIVE DEMO UNIT OPERATION AND SET UP INSTRUCTIONS PENTAIR AQUATIC SYSTEMS 1620 HAWKINS AVE SANFORD NC 27330 800 831 7133 WWW PENTAIRPOOL COM...

Page 2: ...by Pentair Inc Pentair Aquatic Systems and IntelliFlo are trademarks and or registered trademarks of Pentair Water Pool and Spa Inc and or its affiliated companies in the United States and or other co...

Page 3: ...Supply Installing the Piping Gray PVC Suction and Discharge White PVC Suction and Discharge Flexible Coupling Connections Installing Electronics Equipment Connection Diagram 120V 240V A C Transformer...

Page 4: ...LCD Monitor Speaker 120V Wall Outlet Pressure Sensor Box Optional Optional DAQ 202 Black Box Unit 120V Power Strip POWER UP SEQUENCE 1 Main 120V Supply ON 2 Transformer ON 3 Black Box On 4 Monitor ON...

Page 5: ...normal service access The following items come installed in the cabinet Cabinet cooling fan DAQ 202 BLACK BOX Unit PC Computer mounted on shelf with transformer 2 Remove the pump module assembly from...

Page 6: ...ce the tasselled end into opening until metal ring is flush inside the gasket 3 Shake the pipe slightly to allow the tassels to be visible inside the clear section of piping 4 Place the bottom end of...

Page 7: ...he water tub lid and pipes into the open area on the left side of the kiosk cabinet with the 1 1 2 diameter suction pipe section positions toward the front doors Installing White PVC Piping Inside Cab...

Page 8: ...essure Sensor Box Optional Optional DAQ 202 Black Box Unit 120V Power Strip POWER UP SEQUENCE 1 Main 120V Supply ON 2 Transformer ON 3 Black Box On 4 Monitor ON 5 PC Computer ON Critical Step Monitor...

Page 9: ...ower cable found on the back of the transformer through the hole located in the back of the cabinet Attach the cable to a wall AC outlet having a minimum rating of 20 Amps 4 Plug the AC terminal strip...

Page 10: ...2 speaker cables and video cable into the PC computer located on shelf in cabinet 5 Route monitor power cord through the opening behind computer shelf and plug into the AC power strip 6 Install batter...

Page 11: ...up through the pump board 3 Push the quick release metal tabs on the connectors at the pump to install the tube ends RED end goes to the HIGH pressure connector discharge BLUE goes to the LOW pressur...

Page 12: ...ot change preset maximum pump RPM without contacting an authorized Pentair representative DO NOT ADD ADDITIONAL WATER AFTER THE INITIAL START UP Water in pipes could drain downward and cause an overfl...

Page 13: ...show on the program list To install and run the updated the program software 1 Insert the flash drive into the laptop USB port 2 Open the flash drive file from My Computer 3 Open file DAQ Set Up Versi...

Page 14: ...gs up the Cost Comparison Calculator where the pool data can be entered in a 2 step process see next section for details Click Here to Learn More About IntelliFlo Plays an informational video about In...

Page 15: ...culator screen right click on the upper left corner of the screen in the space just to the left of the Standard Pump heading 4 The Meter Screen will appear showing the actual reading from the IntelliF...

Page 16: ...ote If you have 1366 x 768 resolution chose the 1366 x 768 resolution setting ToswitchbetweenCalculatorandpoolsizeselection screen press Alt and Shift at the same time Demo kiosk shipments may include...

Reviews: