14
INTELLIFLO
®
Variable Speed Pump Demo Kiosk Operation and Set Up Instructions
Pump Operation
•
Diffusers on feet, inside water bucket, must rest
flat in tub to prevent stress on unions and possible
leakage.
•
When pump is running at very high speeds, water
may splash excessively, especially during priming
(to purge air within the piping and pump). Be sure
to maintain water level in the tub to avoid splashing
water in cabinet area.
•
Be sure not to exceed the rated capacity of the
electrical outlet. Refer to “
IMPORTANT” warning
on pages i and 10 for more information.
•
If the pump lid is opened, and the water level in
the tub is sufficiently high, there is a possibility that
the water in the piping (4+ gallons) will drain into
the tub and cause an overflow inside the cabinet.
•
Be sure that a sufficient amount of water is removed
from the water tub prior to opening the top lid (basket
section) on the pump.
•
Be sure to read and follow the start up sequence
instructions carefully.
Computer Operation
•
To keep presentation on monitor only (laptop a blank
screen), press FN button and F8 key at same time.
•
To keep presentation centered and focused, go to
Control Panel; then click “Display”. Click last tab
settings and under screen resolution, set to 1440
x 900 resolution.
Note: If you have 1366 x 768
resolution, chose the 1366 x 768 resolution setting.
•
To switch between Calculator and pool size selection
screen, press “Alt” and “Shift” at the same time.
•
Demo kiosk shipments may include a flash drive
with the latest software update. Please follow the
instructions on pages 11-13 to install and run the
latest software version.
Periodically check the following web site to verify
the most recent software version:
http://www.thermal-solutions.com/
customerdata/pentair/PumpDaqSetupUS
TROUBLESHOOTING
Draining the Pump
1. IMPORTANT: before draining the pump, be sure that
all the power to the demo kiosk is off
2. Loosen the pump “basket” section cover, this will
allow the water in the upper piping to drain down into
the water bucket section.
3. Place a bucket or other medium size container on
the floor as close to front of the demo kiosk.
4. Place the open end of the drain hose assembly into
the bucket.
5. Insert the other end (‘white barb’ fitting) into one
of the quick disconnects on the front of the pump.
Water will start flowing out of the pump and into the
bucket.
6. When the water stops flowing, remove the drain
hose by pressing on the metal clip on the quick
disconnect.
7. Repeat this process on the other quick disconnect
fitting.
8. When the water stops flowing, remove the drain
hose assembly, draining is complete.
Note: There will be a small amount of water
remaining in the bottom of the pump.
Drain tube assembly
TROUBLESHOOTING