background image

6

 

INTELLIFLO

® 

Variable Speed Pump Demo Kiosk Operation and Set Up Instructions 

 

120

V

24

0V

ON

USB

LINE IN  POWE

R

FL

OW

 

SENSOR

PRESSURE  SENSOR

OFF

PUMP  POWE

R

HI

LO

CONNEC

TION DIAGRAM

Step-Up

Tr

ansf

ormer

120V/240V

PC Computer

Video Cabl

e

120V

USB

120V

Audio Cabl

e

LCD Monitor

Speaker

120V 

W

all Outlet

Pr

essur

Sensor Bo

x*

(Optional)

(Optional)

DAQ-202 Black 

Bo

x Unit

120V Power Strip

POWER UP SEQUENCE:

1. Main 120V Suppl

y - ON

2. 

Tr

ansf

ormer - ON

3. “Black Bo

x” - On

4. Monitor - ON* 5. PC Computer - ON

*Critical Step:

Monitor must be on befo

re

 

turning on PC computer

.

*Pr

essur

e sensor box is not included but can be or

der

ed separate

ly

 for an additional char

ge.

Flow

 

Sensor

USB

LEGEND

120V POWER 240V POWER LO

W VO

LT

AGE SIGNAL

HIGH PRESSURE TDH (PUMPS DISCHARGE) LO

W PRESSURE TDH (PUMP SUC

TION)

INSTALLING THE ELECTRONIC EQUIPMENT

Summary of Contents for IntelliFlo

Page 1: ...INTELLIFLO VARIABLE SPEED PUMP LIVE DEMO UNIT OPERATION AND SET UP INSTRUCTIONS PENTAIR AQUATIC SYSTEMS 1620 HAWKINS AVE SANFORD NC 27330 800 831 7133 WWW PENTAIRPOOL COM...

Page 2: ...by Pentair Inc Pentair Aquatic Systems and IntelliFlo are trademarks and or registered trademarks of Pentair Water Pool and Spa Inc and or its affiliated companies in the United States and or other co...

Page 3: ...Supply Installing the Piping Gray PVC Suction and Discharge White PVC Suction and Discharge Flexible Coupling Connections Installing Electronics Equipment Connection Diagram 120V 240V A C Transformer...

Page 4: ...LCD Monitor Speaker 120V Wall Outlet Pressure Sensor Box Optional Optional DAQ 202 Black Box Unit 120V Power Strip POWER UP SEQUENCE 1 Main 120V Supply ON 2 Transformer ON 3 Black Box On 4 Monitor ON...

Page 5: ...normal service access The following items come installed in the cabinet Cabinet cooling fan DAQ 202 BLACK BOX Unit PC Computer mounted on shelf with transformer 2 Remove the pump module assembly from...

Page 6: ...ce the tasselled end into opening until metal ring is flush inside the gasket 3 Shake the pipe slightly to allow the tassels to be visible inside the clear section of piping 4 Place the bottom end of...

Page 7: ...he water tub lid and pipes into the open area on the left side of the kiosk cabinet with the 1 1 2 diameter suction pipe section positions toward the front doors Installing White PVC Piping Inside Cab...

Page 8: ...essure Sensor Box Optional Optional DAQ 202 Black Box Unit 120V Power Strip POWER UP SEQUENCE 1 Main 120V Supply ON 2 Transformer ON 3 Black Box On 4 Monitor ON 5 PC Computer ON Critical Step Monitor...

Page 9: ...ower cable found on the back of the transformer through the hole located in the back of the cabinet Attach the cable to a wall AC outlet having a minimum rating of 20 Amps 4 Plug the AC terminal strip...

Page 10: ...2 speaker cables and video cable into the PC computer located on shelf in cabinet 5 Route monitor power cord through the opening behind computer shelf and plug into the AC power strip 6 Install batter...

Page 11: ...up through the pump board 3 Push the quick release metal tabs on the connectors at the pump to install the tube ends RED end goes to the HIGH pressure connector discharge BLUE goes to the LOW pressur...

Page 12: ...ot change preset maximum pump RPM without contacting an authorized Pentair representative DO NOT ADD ADDITIONAL WATER AFTER THE INITIAL START UP Water in pipes could drain downward and cause an overfl...

Page 13: ...show on the program list To install and run the updated the program software 1 Insert the flash drive into the laptop USB port 2 Open the flash drive file from My Computer 3 Open file DAQ Set Up Versi...

Page 14: ...gs up the Cost Comparison Calculator where the pool data can be entered in a 2 step process see next section for details Click Here to Learn More About IntelliFlo Plays an informational video about In...

Page 15: ...culator screen right click on the upper left corner of the screen in the space just to the left of the Standard Pump heading 4 The Meter Screen will appear showing the actual reading from the IntelliF...

Page 16: ...ote If you have 1366 x 768 resolution chose the 1366 x 768 resolution setting ToswitchbetweenCalculatorandpoolsizeselection screen press Alt and Shift at the same time Demo kiosk shipments may include...

Reviews: