THERMAL MANAGEMENT SOLUTIONS
EN-RaychemWinterGardH900-IM-H53665 01/13
10 / 12
Lock nut
Sealing gasket
11A
12A
10
Electric Deicing an
d
Snow Melting Equipmen
t
on Premise
s
13
11b
12b
• Metallic junction
box must be used
to ensure proper
ground.
• Attach ring terminal
to mounting bracket
as shown.
• Insert heating cable
and tighten fitting.
• Make connections
as shown.
• The wire nuts
included are not
intended for use
with aluminum feed
wires.
• Apply “Electric
De-icing” label to
junction box cover.
Note: For WinterGard Wet
cables, follow instructions
provided with junction box
to seal against water if
used in wet locations.
• Insert heating cable and
tighten fitting as shown.
• Make connections as
shown.
• The wire nuts
included are not
intended for use
with aluminum feed
wires.
Note: For junction box
with clearance hole,
use lock nut.
• Insert sealing fitting.
For H612 and H622 heating cables only
For roof and gutter applications only
For H311, H611, H621 heating cables only
For H612 and H622 heating cables only
For H311, H611, H621 heating cables only
For pipe applications