Building Management System (BMS) (optional)
See Table 5 on page 39.
The BMS input of the HWAT-ECO is a 0 to 10-Vdc
input. If the controller is programmed to have a BMS
connection, the BMS controls the temperature set-
point. Using 300-V rated cable, connect the BMS sig-
nal wire to terminal (PL5). Connect the ground wire
to the “–” and the 0-10 V output to the “+” terminal.