10 / 14
Conduit hub
Grounding strap
1/2 in lock nut
7
• Use the MI Cable grounding kit (ordered
separately).
• Insert the cold leads through the conduit
hub and secure.
• Add the grounding strap to the conduit hub
and then secure with 1/2 inch lock nut.
Trim
3
5
6
Notch
4
• Screw box onto stand until it stops. Do not overtighten.
• Insert cable tie through slots on stand and box, and
tighten firmly to prevent box rotation.
• Loosen locknut.
• Lift box and rotate. Make sure tab on threaded piece fits
into one of the four notches in box.
• Tighten locknut.
• Remove 1/2 in (13 mm)
plug and 1/2 in lock nut
from side of enclosure.
(Optional) to change direction of box opening:
IndustrIal Heat tracIng sOlutIOns
EN-RaychemJBS100ECPA-IM-H57463 05/16