3 / 14
IndustrIal Heat tracIng sOlutIOns
EN-RaychemJBS100ECPA-IM-H57463 05/16
XTV, KTV
BTV and QTVR
VPL
Go to Step 5b
Go to Step 5a
Go to Step 5c
4
1/4 in
(5 mm)
6 1/2 in
(165 mm)
BTV and QTVR
5a
• Push braid back to create
a pucker.
• At pucker use a screw-
driver to open braid.
• Bend heating cable and
work it through opening in
braid.
• Lightly score inner
jacket around and
down as shown.
• Peel off inner jacket.
• Notch core.
• Peel bus wire from core.
• Score core between
bus wires at inner jacket.
• Bend and snap core.
• Peel core from bus wire.
• Remove any remaining
core material from bus
wires.
• Pull braid tight to
make pigtail.
go to step 6