Selection Tables

Use one of the tables below to help select 

the correct WinterGard heating cable for 

your application. (Consult the 

Commercial and Residential Application 

and Design Guide or H900/H908 

Installation Instructions for complete sys-

tem design information.) 
Use Table 1 to select heating cables for 

 insulated metal pipes. Use Table 2 for 

 insulated plastic pipes. 

Read across the table to find your pipe 

diameter, then drop down to the line corre-

sponding to the lowest air temperature for 

that application and the correct insulation 

thickness. The cell at that intersection has 

a particular shade and may have a num-

ber. 
The shade indicates which heating cable to 

use (key to the shades appears to the left of 

Table 1). A number in the cell represents 

the spiraling ratio (feet of heating cable per 

foot of pipe). If no number appears in the 

cell, straight trace the pipe. If a number 

does appear in the cell, spiral trace the 

pipe. If your spiraling ratio is 2.0, 

 multiple-trace the pipe using two straight 

traces at the 4 o’clock and 8 o’clock posi-

tions.
If your spiraling ratio is 3.0, multiple-trace 

the pipe using three straight traces at the 

11 o’clock or 1 o’clock position and at the 4 

o’clock and 8 o’clock positions.

1.3

Insulation 

thickness

Lowest

air temp.

0°F

–20°F

–40°F

Pipe diameter

 (inches) 

0.5 in
1.0 in
1.5 in
0.5 in
1.0 in
1.5 in
2.0 in
0.5 in
1.0 in
1.5 in

0.50

0.75

1.00

1.25

1.50

2.00

2.50

3.00

4.00

6.00

2.0 in

1.8

1.1

1.3

1.5

1.1

1.5
1.1

1.9
1.4
1.1

1.8

1.1

1.2

1.1

1.4

1.4

1.7

2.0

3.0

3.0

Insulation 

thickness

Lowest

air temp.

0°F

–20°F

–40°F

Pipe diameter

 (inches) 

0.5 in
1.0 in
1.5 in
0.5 in
1.0 in
1.5 in
2.0 in
0.5 in
1.0 in
1.5 in

0.50

0.75

1.00

1.25

1.50

2.00

2.50

3.00

4.00

6.00

2.0 in

2.0

1.7

3.0

1.2

1.6

1.2

1.1

1.3

1.5

1.4

1.8

1.1

1.3

3.0

1.7
1.4

3.0
1.8

1.8
1.1

1.2

1.1

1.1

1.5

1.9

3.0

1.8

2.0

1.2

1.4

3.0

3.0

1.1

1.2

1.4

1.6

1.4

1.7

1.1

1.3

1.1

1.2

2.0

3.0

Example 1

Pipe = 2-inch-diameter metal

Lowest air temperature = 0°F

Insulation thickness = 1 inch

Cable length and type = 1 foot of 

WinterGard H311 per foot of pipe

Example 2

Pipe = 2.5-inch-diameter plastic

Lowest air temperature = –20°F

Insulation thickness = 1 inch

Cable length = 1.2 feet of WinterGard Plus 

H611, H621 or WinterGard Wet H612, H622

H311 WinterGard
H611/621 WinterGard Plus

H612/H622 WinterGard Wet
Increase insulation thickness.

Key to Tables 1 and 2

Table 1. For metal pipes with fiberglass insulation or equivalent 

(based on 40°F maintain)

Table 2. For plastic pipes with fiberglass insulation or equivalent 

(based on 40°F maintain)

3 / 4

THERMAL MANAGEMENT SOLUTIONS

EN-RaychemWinterGardSelection-AR-H55235    09/13