clean and prepare the pipe or area where the cable will be 

installed.

1.  Verify that major construction is complete.

• Clean the bottom and sides of the pipe where the 

cable will be installed to remove any residual waste or 

contamination.

• If the cable will be placed in drip trays, make sure to 

wipe the surface of the drip tray and remove any liquids 

or debris.

• For sumps, containment trenches, and subfloor 

applications, install TraceTek hold-down clips. For 

TraceTek TT1100-OHP series sensing cables, use 1/2-

inch (13 mm) hold-down clips (TT-HDC-1/2-NA-50).

• Clean the floor surface where hold-down clips will be 

placed so adhesive can work properly.

• Position hold-down clips so the sensing cable will 

provide the desired leak detection coverage. To best 

secure the cable, alternate the direction of the hold-

down clips, and install them at intervals of no greater 

than 6 feet (2 m) and at every change in direction (at 

sides of trench, for example).

important

: Let the adhesive dry per manufacturer’s 

recommendation before proceeding with sensing cable 

installation.

check each length of sensing cable before installation.

•  To ensure that each length of sensing cable is intact and 

free of contamination, follow the Sensing Cable Test 

Procedure. Do not use damaged or contaminated sensing 

cable.

observe proper precautions when handling sensing cables.

•  Observe the do’s and don’ts under “General Notes” on 

page 1 of these instructions; take care to avoid damaging 

or contaminating sensing cable.

installation

Summary of Contents for TraceTek TT1100-OHP

Page 1: ...esigned for testing and troubleshooting TraceTek systems Digital multimeter Can be used as an alternative or supplement to the PTB Meter must have 20 MΩ range TT MAPPING CAP PC PN P000000872 Used to simulate leaks at connector points during commissioning and mapping process Extra TT MLC PC PN 683262 000 Leader cable Used with the ohmmeter to make easier connections to the sensor cable for resistan...

Page 2: ...here hold down clips will be placed so adhesive can work properly Position hold down clips so the sensing cable will provide the desired leak detection coverage To best secure the cable alternate the direction of the hold down clips and install them at intervals of no greater than 6 feet 2 m and at every change in direction at sides of trench for example Important Let the adhesive dry per manufact...

Page 3: ...ps off the bottom of the pipe or fitting Do not install the cable on the top or side surface of a pipe Do not spiral the cable on horizontal pipe Exception If the cable is used to trace vertical pipe the cable should be spiraled around the pipe and secured with tie wraps B For sumps containment trenches and subfloor applications Pull the cable alongside the installed hold down clips minimum bend r...

Page 4: ...ing Cable Test Procedure 3 Connect the sensing circuit to the TraceTek alarm module and activate the system as soon as is practical Use the alarm module to monitor the sensing cable during the final stages of construction Take precautions if installation is incomplete at end of work day At the end of the work day Ensure that there are no open connectors Each sensing cable should be connected to a ...

Page 5: ...A use the PTB to locate the liquid or contamination and take appropriate corrective action Method with Ohmmeter 1 Ensure the end termination is connected to the sensing cable If checking several lengths of sensing cable in series a cable string ensure they are all connected 2 Connect a Modular Leader Cable TT MLC PC to the sensing cable 3 Verify that the sensing cable is intact Loop 1 Measure the ...

Page 6: ...e to have TT MBCs installed on branches as needed to fully trace a pipe system D Install an end termination TT MET PC at the end of the main line and each branch line Note A good check on the system design and bill of materials is that the total number of end terminations installed in the system should equal the number of branch connectors plus one E Optional Install jumper cables TT MJC xxx PC as...

Page 7: ...a channel number and display the words SYSTEM NORMAL If the Yellow LED is on in any of these instruments or the words Cable Break or Loop Break is displayed then the cable system must be inspected for loose connections missing end terminations until the cable continuity is established and the Normal condition is achieved LEAK testing can be done with a mapping cap TT MAPPING CAP PC The MAPPING CAP...

Page 8: ...uced for a new leak Yellow LED visible on TTC 1 TTSIM 1A TTSIM 2 or flashing yellow LED on TTSIM 1 Could be cable break or service indication Refer to alarm module instructions for more infor mation For Cable break indication Check for loose connectors missing end terminations broken jumper wires or physical dam age to the cable Repair or replace cable if necessary The TT MET PC end termination ca...