PROFINET: Changeover from ASi gateways type K20 to KE5
Switch connections
2
0
2
2
-1
1
7
Change power supply to VBG-EP1-KE5-DMD
1.
Take the power supply connections out of the K20 sockets ASi1 PWR+/- and ASi2 PWR+/-.
2.
Plug the connections of the power supply into the sockets 13 and 11 for ASi network 1 and 03
and 01 for ASi network 2.
Figure 2.3
2
3
2
1
2
4
2
2
1
3
1
1
1
4
1
2
0
3
0
1
0
4
0
2
X1
X2
X3
PN
EIP
BF
SF
NS
MS
Hold to
config.
SD
Memory
AUX
ASi Power
Config
ASi Line 2
ASi Power
Config
ASi Line 1
ASi2 PWR+
→
13
ASi2 PWR–
→
11
ASi1 PWR+
→
03
ASi1 PWR–
→
01