background image

5

6

7

WARRANTY CARD

Electromechanical Lock LB-72.1

Serial number

Date of manufacture ________________ 201__

Quality Control Seal

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

Date of sale

«

» ________________ 201__

____________________________________

(signature, seal)

Cutting line

WARRANTY REPAIR COUPON

.1

.

2

7

-

B

L

k

c

o

L

l

a

c

i

n

a

h

c

e

m

o

r

t

c

e

l

E

Serial number

Date of manufacture ________________ 201__

Quality Control Seal

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

_

Date of sale

«

» ________________ 201__

____________________________________

(signature, seal)

Certificate and Operation Manual

www.perco.com

5. MAINTENANCE

6. PERCo WARRANTY

Electromechanical

Mortise Door Lock

- 1

.

2

7

B

L

РОСС RU.СП26

.

Н

ТУ

4981-049-8

8226999-2014

03587

6 6 3

6 6 3

      

  4.3  Installation order

 

e

h

t

a

 

d

e

s

u

 

s

e

l

b

a

C

 .

e

r

u

g

i

F

 

h

ti

w

 

e

c

n

a

d

r

o

c

c

a

 

n

n

e

v

i

g

 

e

r

a

 

s

r

e

b

m

u

n

 

e

c

n

e

r

e

f

e

R

installation are stated in Table 1.
Install the lock in the following order:

1.  Unpack the lock and check the delivery set.
2. Carve out the installation template, which is included in the standard

    delivery set. Make the hole marking for lock cylinder (6), lever rod (5) and,

    if needed, of a location slot for lock forend plate (14) in the door leaf in

    the place of lock installation using the template. Template marking

   corresponds to the one in Fig. 2.
3.  If necessary, select the locating pocket for the lock. 
4.  Carve out holes and choose the location slot for lock forend plate in

    accordance with the marking.
5.  Install the lock (7) in the locating pocket of the door and fasten it with two

    screws 3.9×25 DIN7982 from the delivery set.

6.  Mount the lock cylinder inside the lock and fix it with the screw through 

    the hole on the lock forend plate.
        

 Attention!

         Lock cylinder fastening screw length should not exceed 50 mm.

7.  Adjust the door levers (1) with escutcheon plates (4) in accordance with

     manufacturer recommendations. Tighten them with the screws with

     threaded bushing (3). After the installation levers are to turn easily.
8.  Check the lock operation at the opened door.

     •  Sink the locking mechanism ro

ller (12) inside the lock housing. The bolt

        will move out of the lock housing (13). The lock will be closed.

     

  Insert the key (2) inside the lock cylinder and turn it against stop to check

        the mechanical unlocking. The bolt will return into an initial position inside

        the lock housing. 

     •  Energize lock flan

k contacts with 12V power supply to check the auto- 

        matic unlocking. The bolt will return into an initial position inside the lock

        housing. 

     •  Check several times.

9.  Fix the strike plate (9) on the terminal block housing (10) with two screws

     2.9×13 from the delivery set.

10. Make carving in the door according to the marking (Fig. 2). 
11. Lay the control cable from the  ACS to the terminal block installation place

      inside the door frame. Use cable №1.

 The cable laying method is deter- 

      mined by lock installer and the Customer. 

12. Connect the control cable with terminal clamps (11) from the terminal 

       block. In order to do that, tighten cable ends into terminal clamps.

          

Attention!

         If the lock is operated as a part of access control system (ACS) it 

         is  recommended to install voltage regulator diode BZW06-15B or

         P6KE16CA, or another model with equal parameters on contact 

         clips  (Fig. 3). The voltage regulator diode is used for maintaining

         the device which sends the control signal.

13. Mount the strike plate with the terminal block in the door frame providing 

      2-3 mm spacing between the strike plate and the forend when the door is

      closed. The channel of the strike plate must lay symmetrical to bolt’s cross

      section.
          

Attention!

         The locking mechanism roller should not get into the channel of

         the strike plate! Otherwise, at closing the door, it can get locked 

         with the moving roller and then it will be impossible to open the 

         door without damaging the lock.

14. Mount the strike plate on the door frame with two screws 3.9×25 from the

      delivery set.

15. Install and connect the reed switch. Use cable №2 in table 1

 for connec- 

      tion. Installing the reed switch ensure firm contact closure at closing the 

      door.  
Disassembling of the lock should be made in the reverse order. 

         

Warning!

         

 Do not use the lock at power supply voltage other than specified

           in its   technical specifications.

         • Do 

not use the lock in operation conditions other than specified

           in the  following Manual.

         

 Do not use the lock in hostile environment with atmospheric 

           content of acids, bases, oils, etc. 

The lock is a normally-closed device, which means that in normal condition it 

is locked at the closed door. In this case lever turning is blocked. After lock 

release the door is opened by turning the lever (appro

x

imately at 20º).

Unlocking is performed by:

  

  Turning the key in the lock cylinder. The key is to be turned against stop 

     and kept in such a position until the door opens. 

  

 Terminal block clamps’ energi

z

ing until the door opens. Energi

z

ing is

    operated by the ACS controller. At that the potential operation mode 

    should be set for lock control output. Door opening detection is performed 

    according to the reed switch status. 
At  lock  release  the  bolt  moves  inside  the  housing  and  the  door  can  be 

opened.  At door opening the locking mechanism roller automatically moves 

out of the lock housing. 
At door closing the locking mechanism roller is sunk into the lock housing, 

which initiates bolt moving-out and automatic locking.

PERCo  (the  Manufacturer)  warrants  that  the  LB72.1  electromechanical 

mortise  door  lock  (the  Product)  complies  with  applicable  statutory  safety 

requirements, electromagnetic compatibility provided that the instructions on 

storage, installation and operation, given in the Assembly & Operation Manual 

are observed. 
The warranty period is 

5 (five) years

 commencing from the date of sale.  

Should there be no date of sale on the warranty card, the warranty period 

shall commence from the date of manufacture. 
Within  the  warranty  period  the  Product  is  repaired  free  of  charge  at  the 

Manufacturer’s site. 
The Warranty does not cover Products with e

x

ternal mechanical damages or 

disassembled by the Customer. 
Transportation cost to and back from the place of repair shall be borne by the 

Customer. 
Upon lock purchase request the date of sale stamp in the warranty certificate 

and check the completeness of the delivery set as per the Manual.  
In  case  any  questions  arise  during  the  Product  assembly  or  operation, 

PERCo Company is always ready to give you necessary technical support. 

4.  ASSEMBLY AND INSTALLATION

     

4.1  General recommendations

The lock shall be installed by qualified professionals who have studied this 

Manual before the installation work.
         

Attention!

         In order to provide stable lock operation an accurate ±1,5 mm

        vertical mounting of the strike plate with terminal  block 

         regarding locking bolt is required. The lock operates normally

 

         if the spacing between the forend plate and the strike plate is

         2.5±1.5 mm.

     

4.2  Cable length

Table 1. Cables used.

 

Application

Max

length

Type of cable

An example 

of cable

1 ACS controller

       cable 

30m

Twin cable with 

0.75 mm 

cross-section

2

HO3VV-F,

HO5VV-F  2×0.75  

2

Reed switch 

     cable

30m

Twin cable with

0.2 mm

cross-section 

2

RAMCRO

SS22AF-T

2×0.22 or CQR-2

PERCo 

 Polytechnicheskaya str., 4, block 2   

194021, Saint Petersburg 

Russia 

Tel: 

+7 812 247 04 64 

E-mail: export@perco.com

support@perco.com 

www.perco.com 

Reviews: