TTR-04CW-24 Electromechanical Tripod Turnstile
13
8 INSTALLATION INSTRUCTIONS
8.1 Installation details
It is recommended:
to mount the turnstile on steady and level concrete (grade 400 or higher), stone or
similar foundations at least 150 mm thick;
to level the foundation so that the anchoring points of the turnstile lie in the same
plane;
to apply reinforcing elements (400×400×250 mm) for installation on less steady
foundation (the framed base is possible to be used);
to mark the mounting holes according to Fig. 5 and Fig. 6;
to control the vertical position of the turnstile during installation.
When forming the passage area through the turnstile take into account that the self-
centering mechanism operates as follows:
at the barrier arm turning at the angle of more than 60±5° the reset to home position
is effected in the direction of movement;
at the barrier arm turning at the angle less than 60±5° the reset to home position is
effected in the counter to movement direction.
To ensure accurate passage tracking, when the turnstile is operated from an ACS, it is
recommended to create the passage area in such a way that the barrier arms turning in
the direction of movement must be at an angle no less than 70° (Fig. 4).
Fig. 4 Site preparation. Recommendations
Summary of Contents for TTR-04CW-24
Page 1: ......
Page 2: ...Electromechanical Tripod Turnstile PERCo TTR 04CW 24 Assembly and Operation Manual...
Page 24: ......
Page 26: ...www perco com export perco ru...