Assembly & Operation Manual
6 MARKING AND PACKAGING
The turnstile has the marking on the turnstile housing in the form of a label located on the
inner panel of the turnstile housing. The label contains manufacturer’s trademark and
contact details, year and month of production, operating voltage and power consumption
of the turnstile.
To get access to the label it is necessary to take off the turnstile cover (2) in the following
way:
1. Unscrew the fixing bolts of the cover (17) using the Allen key S3.
2. Carefully lift up the cover and release from fasteners by moving it in passage
direction. Please pay attention for not to break the inner cables.
3. Separate the cable
S1
connector connecting the cover with turnstile housing.
4. Carefully take off the cover and lay it on a plain and steady ground.
The complete delivery set of the turnstile (Clause 4.1) is packed in a transportation box,
which keeps it undamaged during the transportation and storage.
Transportation box dimensions (L × H × W) ................................. 1190×450×420 mm
Transportation box weight (gross) ................................................ no more than 53 kg
7 SAFETY REQUIREMENTS
7.1 Installation safety requirements
The installation should be carried out only by the qualified personnel after careful study of
this
Manual
.
Warning!
All the cables
should be connected up when the power supply is switched off
from the AC mains.
Only serviceable tools should be used for installation.
Observe general electrical safety rules when laying out the cables.
Before the turnstile first power on make sure its installation and connection have
been made accordingly.
Power supply unit installation must be made in accordance with the safety rules stipulated
in its certificate.
7.2 Operation safety requirements
Observe general electrical safety rules when operating the turnstile.
Warning!
Do not use the turnstile under conditions that do not comply with the
requirements of Chapter 2 of this Manual.
Do not use the turnstile at supply voltage that does not comply with the
requirements of Chapter 3 of the Manual.
Safety requirements on the power supply units operation are shown in their certificates.
16
Summary of Contents for TTR-08A
Page 34: ...www perco com...