TTR-10A electromechanical tripod turnstile
The
MT10.1
bracket must be installed on vertical (level-controlled) steel pipes with a diameter of
30-35 mm, and at least 2 mm of thickness, securely fixed to the floor (floor and ceiling) using
flanges with a support area of at least 75 cm
2
each (mount flanges with three or four M8 bolts at
least). The distance between the uprights at the bracket mounting location should be 263±1 mm.
MT10.2
mounting bracket should only be installed on the main walls of concrete buildings (grade
400 or higher) with at least 10 mm thickness, using at least four M8 or M12 anchor bolts. In this
case, the bracket mounting points must resume in one vertical plane (control with a level).
Warning!
The turnstile installation height must be taken into account, when installing it on the
brackets. The recommended turnstile installation height should be approximately
900-950 mm from the floor to the upper edge of the barrier arm.
The
MT10.3
mounting post must be installed on strong, even, stone or concrete (grade 400 or
higher) or other bases with a thickness of at least 150 mm, using four M12 anchor bolts. In this
case, the installation surface must be leveled the way the mounting points of the turnstile post are
in the same horizontal plane (control with a level). When installing the turnstile post on a less solid
base, it is necessary to use embedded foundation elements of at least 300×300×300 mm size. It is
also possible to use a frame base.
Passage zone organization:
The turnstile is equipped with an electric drive for the barrier arms rotation. When rotated 5° or
more, the barrier arms turn in the passage direction (when rotated 60° or more, the barrier arms
cannot be returned to their original position, since the return passage is blocked). When rotated at
an angle of less than 60° the barrier arms return to their original position in 8 sec. To ensure
accurate tracking, when the turnstile is operated from an ACS, it is recommended to create the
passage area in such a way that the barrier arms should turn in the passage direction by an angle
of more than 60° (Fig. 13).
Follow the recommendations (Fig. 13) to ensure the required angle of rotation when installing the
turnstile.
When organizing the passage area, it is recommended to arrange an additional emergency exit.
For example, it can be the
BH-02
automatic rotary section (Sec. 9.4).
Figure 13. Passage area. Recommendations
8.2 Installation tools
Tools recommended for the turnstile installation:
1.2÷1.5kW hammer drill;
Ø16 mm hard-alloyed drill bits;
Floor chaser for electric raceway;
Flat slot SL3×0.5 screwdriver;
19