8  INSTALLATION 

 

Attention! 

The  manufacturer  will  not  accept  liability  for  any  damage  to  the  gate  
or  other  equipment,  or  otherwise  loss  caused  as  a  result  of  improper  installation, 
and will dismiss any claims by the customer should the installation work be carried 
out not in accordance with this Manual. 

8.1  General recommendations 

Proper  installation  is  critical  to  performance  and  serviceability  of  the  gate.  We  strongly 
advise  to  study  this  section  before  installation  work  is  commenced,  and  follow  the 
instructions to the letter over the course of the installation.  

Installation  to  be  carried  out  by  at  least  two  persons  qualified  in  assembly  and  electric 
work. 

We advise: 

  mounting the gate on flat, solid concrete floors (grade 400 or higher, SCS B22.5), 

stone or similar foundations at least 150 mm thick; 

 

employing reinforcing elements 250×250×400

 

mm for soft grounds; 

  using relevant mounting hardware for installation on different foundations; 
  making  sure  the  mounting  foundation  is  horizontal  and  flat;  the  flatness  deviation 

must not exceed 1.5 mm; 

  installing optional equipment in the sequence given in sect. 8.3. 

8.2  Installation tools 

 

1.2÷1.5 kW hammer drill; 

 

Ø16 mm hard-alloyed drill bits; 

  Horn-type and socket wrenches: S17, S13; 
  Allen keys SW4, SW6; 
 

№2 cross-tip screwdriver, 150 mm; 

 

№5 straight- slot screwdriver, 150 mm; 

  2 m tape-measure; 
  level gauge; 
  two stepladders (4 steps or more). 

 

Note: 

Use  of  other  similar  tools  is  allowed  providing  they  do  not  reduce  quality  of  the 
installation work. 

8.3  Installation of standard and optional equipment 

Carry  the  installation  work  in  accordance  with  respective  manuals  and  below  guidelines. 
Exact installation sequence depends on the chosen entrance point layout. 

For installation of the gate together with the 

MB-16

 full height railings, we recommend the 

following installation sequence: 

1.  the gate; 
2.  standard sections of the full height railing; 
3.  extension sections of the full height railing. 

Summary of Contents for WHD-16

Page 1: ...INSTALLATION AND OPERATION MANUAL WHD 16 Full Height Security Gate...

Page 2: ...Full Height Security Gate WHD 16 Installation and Operation Manual...

Page 3: ...atures 8 5 2 Design and operation 8 6 MARKING AND PACKAGING 9 7 SAFETY REQUIREMENTS 9 7 1 Installation safety requirements 9 7 2 Operation safety requirements 9 8 INSTALLATION 10 8 1 General recommend...

Page 4: ...Abbreviations PS power supply ACS access control system 1 APLICATION The WHD 16 full height security gate is designed for management of pedestrian flows and access control at entrance points of facil...

Page 5: ...urrent 3 A Power consumption 36 W Throughput rate in the single passage mode 12 persons min Average daily throughput in the single passage mode 2 000 persons day Passageway dimensions H W 960 2000 mm...

Page 6: ...on request Power supply 1 MB 16 full height railing sections determined by the customer Fasteners 1 determined by the customer Anchor bolt SORMAT PFG IR 10 15 Finland 2 4 Note Technical characteristic...

Page 7: ...Installation and Operation Manual 6 Figure 1 General view of the WHD 16 gate 1 frame 2 leaf 3 electromechanical lock 4 door closer...

Page 8: ...WHD 16 Full Height Security Gate 7 Figure 2 Overall dimensions of the WHD 16 gate...

Page 9: ...through four mounting holes in the post flanges In the home position closed for entrance and exit the leaf provides complete closure of the passageway between the posts the lock is locked up After th...

Page 10: ...ed for installation Observe general electrical safety rules when laying out the cables Before the turnstile first power on make sure its installation and connection have been made accordingly Power su...

Page 11: ...00 mm for soft grounds using relevant mounting hardware for installation on different foundations making sure the mounting foundation is horizontal and flat the flatness deviation must not exceed 1 5...

Page 12: ...ble to the door sensor Fig 3 Figure 3 Mounting hole pattern 3 Insert sleeves for anchor bolts into the holes so that they do not stick out above the floor surface Attention Be extra cautious and caref...

Page 13: ...mended to install a door sensor reed switch The magnetic part of the sensor is installed in the leaf it is recommended the upper part of the leaf and the sensor itself is installed in the gate frame 8...

Page 14: ...opened with a key or remotely from the inside the lock is opened by pressing the button and remotely with the blocked exit button opening from the outside as in the normal mode and from the inside th...

Page 15: ...s high The gate should be stored indoors at ambient temperature from 40 C to 45 C and relative air humidity below 98 at 25 C The environment should be free of acid and alkali vapours or corroding gase...

Page 16: ......

Page 17: ...PERCo Polytechnicheskaya str 4 block 2 194021 Saint Petersburg Russia Tel 7 812 247 04 64 E mail export perco com support perco com www perco com...

Page 18: ...www perco com...

Reviews: