PHCW1500-LED
V. 02
–
26/08/2019
5
©Velleman nv
1.
Mark and drill the holes according to the installation scheme above.
2.
Insert a nylon plug [1] into each drill hole.
3.
Fasten the screws [3] to the ceiling through the ceiling bracket [2].
4.
Insert the hanging lines [4] into the line holes [A] of the ceiling bracket. Manually adjust
the length by pushing the hanging line through the line hole [A].
5.
Clip the power cord onto the cable clip [B].
Heater
–
Wall-/Ceiling-Mount Installation
1.
Mark and drill the holes according to the installation scheme above.
2.
Insert a nylon plug [1] into each drill hole.
3.
Fix the bracket [2] with the screws [3].
4.
Fix the heater [4] to the bracket with the screws [5].
5.
Adjust the heater angle and fix [A].
Remote Control
WARNING
–
Do not puncture batteries or throw them in fire as they may explode. Do not
attempt to recharge non-rechargeable batteries (alkaline). Dispose of batteries in accordance
with local regulations. Keep batteries away from children.
Open the battery compartment, install the battery inside and close the battery compartment.
6.
Operation
1.
Insert the power plug into the mains.
2.
Switch the appliance on/off by means of the on/off switch. The appliance is now in standby
mode. The heating LED blinks.
Control Panel Operation
1.
Press the on/off button to select these sequential options:
heating
→
h light
→
light
→
standby
2.
Switch off and disconnect the appliance after use.
Remote Control Operation
1.
Press the HEAT button on the remote control to switch the heating option on/off.
2.
Press the LIGHT button on the remote control to switch the light option on/off.
3.
Press the OFF button on the remote control to return to the standby mode.