background image

 3/8" 

 3/8" 

 4 1/2" 

 1" 

  11/16" PRE-DRILLED HOLE 

 1" 

  11/16" ATTACHMENT HOLE 

 1 1/2" 

  11/16" FIELD DRILLED HOLE 

 HOLE SPACING 

 ANGLE CUT LENGTH 

 1" 

APPLY 3 COATS ZINGA TO 

ALL FIELD CUT EDGES

DETAIL Z

HORIZONTAL ANGLE CUT AND PUNCH

 HOLE SPACING 

DETAIL Y

HORIZONTAL ANGLE ATTACHMENT

5/8" X 2" BOLT KIT

DETAIL AA

ATTACHMENT LOCATION

PV-GS-ACC1

INSTALLING HORIZONTAL ANGLE KIT AND ANCHORS

PerfectVision Manufacturing highly recommends specifying the PV-HSK Horizontal Support Kit to interconnect 

sectors on all towers with face widths less than 10ft and leg diameters less than 4in OD. If attachment 

locations are to be installed, PV-HSK kit is REQUIRED on towers with 4in OD and smaller legs. 

HSK installation 

requires a (3) Sector Frame setup. Field cut and punch Horizontal Angles as shown in Detail Z. Attach Horizontal Angles to 

Leg Brackets as shown in Detail Y. Install max (1) Anchor (PV-LPP-GS-ACC1) per leg. Follow manufacturer specifications for 

installation and maintenance.

GALVANIZED

48.79

A36

STEP 7

www.perfect-vision.com

PV-SFA-INS-01-R6

1-844-887-6723

14 OF 20

Summary of Contents for PV-SFA

Page 1: ...if you Don t understand these directions or have any doubts about the safety of the installation Are uncertain or unfamiliar with the nature of the existing structure to be reinforced For questions an...

Page 2: ...g Frame to Tower Leg 10 Pre Assembling Sector Frame Installing Frame to Tower Leg cont 11 Installing Tie Back Pipes 3 Sector Installation 12 Installing Tie Back Pipes Single Sector Installation 13 Ins...

Page 3: ...CH Table 1 PV SFA B Configurations Part Number Mount Width Face Angle Total Weight PV SFA7 B 7 6 PV SFA ANGLE7 HD 510 lbs PV SFA10 B 10 6 PV SFA ANGLE10 HD 560 lbs PV SFA12 B 12 6 PV SFA ANGLE12 HD 59...

Page 4: ...WASHER PLATE QTY 4 WEIGHT 1 LBS EACH P520 019 01 STIFF ARM END PLATE QTY 2 WEIGHT 1 LBS EACH P597 223 01 STIFF ARM CROSSOVER QTY 2 WEIGHT 5 LBS EACH HK6 4025 04 1 2 X 2 9 16 U BOLT KIT QTY 16 WEIGHT...

Page 5: ...GHT 0 06 LBS EACH HK1 0815 10 1 2 X 1 1 2 BOLT KIT QTY 10 WEIGHT 0 24 LBS EACH HK1 0817 10 1 2 X 1 3 4 BOLT KIT QTY 8 WEIGHT 0 23 LBS EACH HK1 1020 12 5 8 X 2 A325 BOLT KIT QTY 14 WEIGHT 0 35 LBS EACH...

Page 6: ...E MOUNT SECTOR FRAME HORIZONTAL ANGLE KIT WEIGHT 300 LBS 120 P297 019 01 BRACE ANGLE QTY 6 WEIGHT 50 LBS EACH NOTE DRAWINGS NTS Supplied Parts List 6 OF 20 1 844 887 6723 PV SFA INS 01 R6 www perfect...

Page 7: ...HK1 1017 12 5 8 X 2 3 4 BOLT KIT QTY 2 WEIGHT 0 53 LBS EACH H10 1012 08 1 2 X 12 ALL THREAD QTY 2 WEIGHT 0 63 LBS EACH H02 0008 13 1 2 A63DH NUT QTY 4 WEIGHT 0 07 LBS EACH H03 0008 02 1 2 F436 FLAT WA...

Page 8: ...2 NUT DETAIL D FACE ANGLE ATTACHMENT 1 2 X 1 1 2 BOLT 1 2 FLAT WASHER 1 2 LOCK WASHER 1 2 NUT PRE ASSEMBLING SECTOR FRAME Pre assemble the Sector Frame as shown at the ground level Connect 2 Rotation...

Page 9: ...er Bolt location is determined by taper of tower leg at mount elevation See Detail H for hole details Reference Table 2 for hole installation based on leg taper Note Leg taper is denoted as degrees fr...

Page 10: ...TOWER LEG Continue pre assembly by connecting 2 Outer Leg Attachment Plates using 4 5 8 X 2 Bolt kits each Note location of flat washers on slotted holes See Reference Pages R 1 R 2 for the option to...

Page 11: ...USTMENT BOLTS BOLT GROUP 1 INSTALLING FRAME ONTO TOWER LEG CONT Adjust Bolt Group 1 to change Frame pitch Ensure Frame face is normal to horizontal Adjust azimuth by loosening Bolt group 2 and positio...

Page 12: ...n tower legs Attach Tie Back Pipe to the face of the Frame using 1 Stiff Arm End Plate 1 1 2 x 1 1 2 Bolt Kit and 1 5 8 x 4 Bolt Kit Attach Tie Back Pipe to the Leg Bracket of the adjacent Sector Fram...

Page 13: ...ingle Sector installations only For 3 Sector installations see Step 6A Attach Tie Back Pipe to the face of the Frame using 1 Stiff Arm End Plate 1 1 2 x 1 1 2 Bolt Kit and 1 5 8 x 4 Bolt Kit Attach Ti...

Page 14: ...g the PV HSK Horizontal Support Kit to interconnect sectors on all towers with face widths less than 10ft and leg diameters less than 4in OD If attachment locations are to be installed PV HSK kit is R...

Page 15: ...tallation NOTE IF OTHER SPACINGS ARE NEEDED IT IS ACCEPTABLE TO FIELD DRILL ADDITIONAL HOLES IN THE SAME FACE ANGLES APPLY 3 COATS ZINGA TO ANY DRILLED HOLES Table 3 Antenna Pipe Spacing Part Number 3...

Page 16: ...ING LOCKING SAFETY CLIMB CABLE GUIDE SOLD SEPARATELY PV SCRB SFA SAFETY CLIMB CABLE RECOMMENDED ROUTING RECOMMENDED ROUTING AREA PV SCRB SFA SFA CABLE GUIDE ATTACHMENT KIT WEIGHT 1 63 LBS EACH PURCHAS...

Page 17: ...NCLUDED WITH PV SCRB SFA FOR ATTACHING SAFETY CLIMB CABLE GUIDE ADD ON PRODUCT WASHER TO BE PLACED ON INSIDE OF CONNECTION ON ARC SLOT SAFETY CLIMB EXTERIOR ROUTING INSTALLATION REFERENCE INTERIOR ROU...

Page 18: ...LE OFFSET THE CENTERLINE OF AN ANTENNA EXISTS AT AN EQUAL DISTANCE BETWEEN THE TOP AND BOTTOM END OF THE MAIN ANTENNA BODY AS SHOWN BELOW IN THIS EXAMPLE THE MAXIMUM OFFSET FACTOR VALUE WILL BE 6 FROM...

Page 19: ...TICAL MOUNTING PIPE DOES NOT AFFECT MOUNT C L MAXIMUM ALLOWABLE OFFSET NO COLLAR MOUNTS PRESENT IF ANTENNA PIPES ARE OFFSET THIS DOES NOT AFFECT THE LOCATION OF THE MOUNT CENTERLINE IN THIS EXAMPLE TH...

Page 20: ...SET FOR DUAL COLLAR MOUNTS IN A DUAL COLLAR MOUNTING SCENARIO THE MOUNT CENTERLINE EXISTS AT AN EQUAL DISTANCE BETWEEN BOTH COLLAR MOUNTS AS SHOWN BELOW IN THIS EXAMPLE THE MAXIMUM OFFSET FACTOR VALUE...