3/8"
3/8"
4 1/2"
1"
11/16" PRE-DRILLED HOLE
1"
11/16" ATTACHMENT HOLE
1 1/2"
11/16" FIELD DRILLED HOLE
HOLE SPACING
ANGLE CUT LENGTH
1"
APPLY 3 COATS ZINGA TO
ALL FIELD CUT EDGES
DETAIL Z
HORIZONTAL ANGLE CUT AND PUNCH
HOLE SPACING
DETAIL Y
HORIZONTAL ANGLE ATTACHMENT
5/8" X 2" BOLT KIT
DETAIL AA
ATTACHMENT LOCATION
PV-GS-ACC1
INSTALLING HORIZONTAL ANGLE KIT AND ANCHORS
PerfectVision Manufacturing highly recommends specifying the PV-HSK Horizontal Support Kit to interconnect
sectors on all towers with face widths less than 10ft and leg diameters less than 4in OD. If attachment
locations are to be installed, PV-HSK kit is REQUIRED on towers with 4in OD and smaller legs.
HSK installation
requires a (3) Sector Frame setup. Field cut and punch Horizontal Angles as shown in Detail Z. Attach Horizontal Angles to
Leg Brackets as shown in Detail Y. Install max (1) Anchor (PV-LPP-GS-ACC1) per leg. Follow manufacturer specifications for
installation and maintenance.
GALVANIZED
48.79
A36
STEP 7
www.perfect-vision.com
PV-SFA-INS-01-R6
1-844-887-6723
14 OF 20