3/8"
3/8"
4 1/2"
1"
F
G
DETAIL E
ADJUSTMENT PLATE INSTALLATION
DETAIL F
SCALE 1 : 10
DETAIL F
TOP ADJUSTMENT PLATE
TOP ADJUSTMENT
PLATE
DETAIL G
SCALE 1 : 10
DETAIL G
BOTTOM ADJUSTMENT PLATE
BOTTOM
ADJUSTMENT PLATE
TOWER SIDE
FRAME SIDE
3
2
1
FRAME SIDE
TOWER SIDE
A
B
PRE-ASSEMBLING SECTOR FRAME CONT'
Continue pre-assembly by attaching Top and Bottom Adjustment Plates to the frame using (3) 5/8" x 2-1/2" Bolt Kits each.
Note: Center Bolt location is determined by taper of tower leg at mount elevation. See Detail H for hole details. Reference
Table 2 for hole installation based on leg taper. Note: Leg taper is denoted as degrees from vertical.
DETAIL H
TAPER ADJUSTMENT DETAILS
5/8" X 2-1/2" BOLT
WASHER PLATE
5/8" FLAT WASHER
5/8" LOCK WASHER
5/8" NUT
Table 2: Leg Taper Installation Holes
Leg Taper Range 0 to 0.75
0.75 to 1.75 1.75 to 2.25 2.25 to 3.5
3.5 to 4.5
4.5 to 5.5
Upper Leg Hole
1
1
2
2
3
3
Lower Leg Hole
B
A
B
A
B
A
NONE
685.54
---
STEP 2
www.perfect-vision.com
PV-SFA-INS-01-R6
1-844-887-6723