Install the first piece of roof
decking making sure not to
extend past plate edge.
Board may need to be cut to
length. (At times decking
may need to be spliced on a
single rafter.) Fasten decking
using two 2” nails per rafter.
12
36
37
39
Install the first piece of roof
decking making sure not to
extend past plate edge.
Board may need to be cut to
length. (At times decking
may need to be spliced on a
single rafter.) Fasten decking
using two 2” nails per rafter.
Securely interlock each piece
of the roof decking, starting
from the bottom and working
up.
38
Repeat on all four sides.
SIDE
VIEW
Note: With metal roof installation,
fascia should be installed 3/4" higher
than the top of the roof decking.
Starting on the long side, hold
fascia in place butting the top
of the fascia board against a
square, following the pitch of
the decking. Fascia should not
be lower than the pitch of the
decking; the end of the fascia
should remain flush with the
end of the plate.