20
Use four 5/8” roofing nails
and attach to roof through
shingle at the center line
marked on the shingle. Do
not fasten below the line or
your fasteners will be exposed.
2
Start second row, line up
bottom of shingle with the
architectural line on the
shingle below.
3
4
Attach second row of shingles
to the roof using 5/8” roof
nails provided or a power
stapler. Do not use long nails
or staples that protrude
through 1X6 roof decking.
To install 1st row of shingles,
turn shingle upside down
with black tar line at bottom
edge facing up and attach to
roof using four 5/8” roofing
nails. Place nails approximately
3” from bottom.
1
Summary of Contents for PREMIUM VINYL PAVILION
Page 34: ...You are now ready to return to page 12 step 38 19 34...
Page 35: ...35 Notes...
Page 36: ...36 Notes...