After placing post bases on
from step 9, slide HD high
wind bracket onto the bottom
of the post. Screw two
3/8”x3” hex lags into the
pre-drilled holes on opposite
sides of the bracket. Repeat
on all posts. Continue on with
regular instructions, starting
at step 10.
Screw the remaining six 3/8” X
3” hex lags into each post,
using the pre-drilled holes.
Repeat with all posts.
1
2
28
Remove dust from hole. Next,
screw the nut and washer on
about 1/8” below the top of
the bolt. Insert the wedge
anchor bolt into the hole. Tap
the bolt into the ground using
a piece of wood as a buffer to
protect the threads and nut.
Repeat on remaining 3 sides
of the post then repeat on
all other posts.
3
Heavy Duty Anchors for High Wind
Summary of Contents for PREMIUM VINYL PAVILION
Page 34: ...You are now ready to return to page 12 step 38 19 34...
Page 35: ...35 Notes...
Page 36: ...36 Notes...