6X
X2
Make sure the posts are all level
and everything is square. With
base trim still raised, fasten two
L-brackets on the outside edges
of each post with five 2 1/2"
screws per bracket. Some engi-
neering specifications may
require 4 brackets per post.
NOTE: For HD High Wind
brackets see bracket appendi-
ces on page 27 Steps 2-4.
Locate twenty-four 8" GRK
screws in the hardware box (if
you have a standard 4 post struc-
ture). Those go in the pre-drilled
holes at the corners of the
beams.(6 per corner)
Attach short end headers with
three 3 1/2” screws (in the pre-
drilled holes) into the end of
the other two beams. Repeat
on opposite side with the last
remaining beam.
Locate the 12 GRK 4” screws.
Screw three GRK 4” into left
and right side of the header
seam on the center post
(using the pre-drilled holes).
Repeat on the opposite side
of the pavilion anchoring your
last two beams.
15
6
12
13
14
Summary of Contents for PREMIUM VINYL PAVILION
Page 34: ...You are now ready to return to page 12 step 38 19 34...
Page 35: ...35 Notes...
Page 36: ...36 Notes...