PERI InSite Construction -
Data Acquisition System
Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –
In the dashboard, the hardware systems assigned to the project are displayed as widgets in
the menu bar. In addition to the hardware widgets, there are also tool widgets.
First drag the widgets used for the measurement into the dashboard (see Figure 7).
Figure 7: Web Application Dashboard with different widgets
A measurement session can be started by scheduling start and stop time in the calendar
settings.
With an increased number of managed projects and Main Units the difficulty level
increases as well as the risk of making an error. Make sure you are working with the
correct Main Unit and project when making changes.
Set the desired
Node Upload Rate (Connection Interval)
. This is the rate at which the nodes
connect and upload data to the Main Unit in the “Settings” of the node widget. Normally three
hours is sufficient but for users that want to see data more instantly for example 15 minutes is
recommended.
Set the desired
Main Unit Connection Rate (Connection Interval) in the main unit widget
.
This is the rate at which the Main Unit will connect to the Web Portal and upload data as well
as fetch new settings. When the Main Unit is connected through the Technical Cabinet to the
mains supply five minutes is recommended. For Main Units with battery only supply three
hours is recommended.
Click
Save and send to the unit
to make the new settings available to the Main Unit on its
next connection.
Compressive Strength
Temperature Monitoring
Humidity
Temperature
Signal Strength
Battery Level
Internal Temperature
Settings
Calendar Settings