Hand-operated boom barriers Type GHS
Electrically operated boom barriers Type GES
Electro-hydraulically operated boom barrier Type GEHS
P
erimeter
P
rotection
G
ermany
G
mbH
Document: 2050274
Created: 11.04.2011
Version: a
Changed: 15.08.2013
Page 37 of 93
Original version
Subject to change
Note
.
Installation of our boom barrier systems may only be carried out by
personnel specifically authorised by us. Please note that we can only
provide warranty in case of correct and proper installation.
The applicable
Accident Prevention Regulations have to be observed.
5.2 Preparations
Before installation work is started, the foundations should be checked using the foundation
drawings we enclose. If no foundation drawings were supplied, please request them from us.
Note
.
General foundation drawings can easily be found on our website
, where they are available for download.
Figure 5.1
Example of a foundation drawing
(Hand-operated boom barrier Type GHS 3
– 6m with sleeve foundation for fixed
support post)
Figure 5.2
Sample foundation drawing
(Electro-mechanical boom barrier Type GES 4 m with base plate for fixed support post)