background image

 

13 

N1015158 OPERATING MANUAL                              
 

 
5. MAINTENANCE 
 
 

The N1015158 requires very little routine maintenance by the user. 
 
 

Any operation that requires the units to be opened must only be performed by Perkin 
Elmer technicians or authorized personnel. 

 
Always unplug from the mains when opening the units 
 
 

5.1. Cleaning the instrument 

 
For normal cleaning operations on the instrument only use a cloth dipped in water or neutral 
detergent, do not use organic or abrasive solvents. 
 
 

5.2. Water level alarm 

 
Check for signs of water level. It is recommended that this is done prior to starting analysis. 
If  a  "Water  level"  alarm  is  signalled  immediately  check  for  spillage  in  the  accessory 
compartment and remove it with appropriate measures. Using the refilling bottle supplied to 
fill the system with liquid via the inlet or outlet connectors until the light turns off. 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for Peltier N1015158

Page 1: ...rolled Fluid Circulator P N N1015158 Web address http las perkinelmer com OneSource Environmental directives htm Customer Care 1 800 762 4000 inside the USA 1 203 925 4602 outside the USA 0800 40 858...

Page 2: ...1 Instrument description 4 2 2 N1015158 front and rear panel 5 2 3 Specifications 5 2 4 User interface 7 3 INSTALLATION 8 3 1 Checking the serial number 8 3 2 Checking main supply and fuses 8 3 3 Inst...

Page 3: ...before starting any work inside the instrument Set the temperature to the required values on power on If using substances dangerous for health and the environment observe the laws and the standards i...

Page 4: ...cording to the appropriate Perkin Elmer procedure e The equipment installation must be carried out in accordance with local requirements for responsibility and warranty 1 3 Safety makings CE mark The...

Page 5: ...ferent metals The N1015158 provides temperatures ranging from 20 C to 60 C with 1 C stability and 0 1 C repeatability The features of the PCB 1500 include Peltier effect for heating and cooling the li...

Page 6: ...et connections 2 3 Specifications 2 3 1 Keypad Display Unit The keypad display unit has a LCD screen All programmable parameters can be displayed in specific menus Three buttons are used to access the...

Page 7: ...ed If using flammable or explosive substances take the necessary precautions Note Connection to the protective ground is ensured through the power supply cable which has to be in accordance with CEE 7...

Page 8: ...The menu driven interface of the N1015158 allows the user to set the temperature and to view the configuration Three buttons are used to access the various functions and change the set parameters The...

Page 9: ...inform Perkin Elmer immediately 3 2 Checking mains supply and fuses The N1015158 is factory set to operate at 220 VAC For operation at a voltage of 120 VAC the voltage selector at the rear of the cont...

Page 10: ...sired value The new selected voltage will be now visible 3 3 Instrument set up 3 3 1 Start up The N1015158 is supplied completely assembled It is only necessary to make the appropriate connections Bef...

Page 11: ...N1015158 has no special electrical external connections which would allow relay control etc Operations are performed either manually or via remote control using the USB connections Contact Perkin Elme...

Page 12: ...it 1 only if the manual alarm reset option has been configured Menu page and functions of the buttons Menu Description L button Middle button R button Parameter User parameters Scroll Select Exit Conf...

Page 13: ...equired to enter this menu CAUTION all these parameters are correctly set in the factory no changes should be made by the user Diagnostic parameters Description Unit of measure Cell temperature C Radi...

Page 14: ...normal cleaning operations on the instrument only use a cloth dipped in water or neutral detergent do not use organic or abrasive solvents 5 2 Water level alarm Check for signs of water level It is re...

Page 15: ...akage will be detected After the leakage is signalled on the N1015158 press the RESET ALARM button and remove the leakage immediately by checking all connections and fill up the system with distilled...

Page 16: ...THE TANK WILL DROP AND WILL NEED TO BE TOPPED UP ONLY USE THE DISTILLED WATER SUPPLIED IN THE SEPARATE 200CC CONTAINER INSIDE THE PACKAGING TO TOP UP THE WATER IN THE UNIT Web address http las perkin...

Reviews: