Servicing Information
93
RS232 / V.24 Null-Modem Cable
Figure C-12 RS232 / V.24 Null-Modem Cable
The connecting cable must be a shielded cable.
This cable is needed when it is necessary to connect two units
back-to-back and a set of modems is not available. Note that this
cable specifies DB25 connectors on each end to allow direct
connection to the link interface connector on each unit. The link
speed must be defined for each of the two units.
Shield
Signal Ground
DB25 MALE
1
20
7
8
15
17
24
DB25 MALE
1
8
7
20
24
17
15
Signal Ground
Shield
Transmitted Data
Received Data
Received Data
Transmitted Data
Request To Send
Request To Send
Received Line Signal Detector (CD)
Data Set Ready
Data Set Ready
Received Line Signal Detector (CD)
DTE Ready
DTE Ready
Transmit Timing DCE Source
Receiver Timing DCE Source
Transmit Timing DTE Source
Receiver Timing DCE Source
Transmit Timing DCE Source
Transmit Timing DTE Source
2
3
2
3
4
6
4
6
Summary of Contents for PERLE P850
Page 6: ......
Page 21: ...Installation 15 Figure 1 4 Front View of the P850 router Tx Rx Power ...
Page 83: ...Octet Locations on Ethernet Frames 77 Octet Locations on a Bridged XNS Frame ...
Page 101: ...Servicing Information 95 ...
Page 106: ...100 Router A PC used for TFTP transfers Link 1 Link 2 Router B Router C ...