4B-1
4B-2
4B-3
A3
10mm
Use the hammer to knock
anchors A3 into the wall.
70
Install wall plate using lag bolts A1, washers A2 and anchors A3. Be sure the
anchors [A3] are seated flush with the concrete surface. Tighten the lag bolts
[A1] only until the washers [A2] are pulled firmly against the wall plate[05] . DO
NOT over-tighten the lag bolts [A1].
Position the wall plate at your desired
height, level the wall plate and mark the
pilot hole locations.
Drill 4 pilot holes using a 25/64
in.(10mm) diameter drill bit.Make sure the
depth is not less than 70mm.
05
A2
05
8