Greasing the Machine
1 There are 5 grease fittings on the Ride-On Ultra
2 There are 3 fittings located on the articulating linkage
3 There is 1 grease fitting on each of the 2 rear wheel hubs
TOOLS
Grease gun
Winterizing the Machine
1 Low pressure wash and rinse machine thoroughly
2 Blow dry
3 Spray machine down with WD-40, paying particular attention to moving parts such as bearings
and linkages
4 Flush and drain the tank and pump
5 Add RV anit-freeze to tank and run through the entier spray system
6 Change engine oil and air filter. Drain gass or run engine until empty
7 Remove battery and store in a warm area NOT IN CONTACT WITH CONCRETE
TOOLS
Perform these steps in the next hundred hour segment from your Preventative Maintenance Log
© 2004 Perma Green Supreme, Inc. All rights reserved.
DOCUMENT ID: U005M
page
14