e bunt.doc
Rev. 14.06.2010
Seite /
Page
29 / 40
Perrot REGNERBAU CALW GmbH
Industriestraße 19-27 / D-75382 Althengstett / Germany
Telefon : 0049-7051-162-0 / Fax : 0049-7051-162–133
E-mail : perrot@perrot.de
/ E-mail Konstruktion : technik@perrot.de
Put O-ring over the new nozzle
and, reversing the procedure, re-install in the sprinkler head.
Fit cover into sprinkler head’s snap-in connection by first pushing it as far as it will
go against the side opposite the nozzle and then snapping it completely into place on
the nozzle side.
O-Ring
Nozzle