MISCELLANEOUS OPERATIONS
19
Reproduction or translation, even partial, is forbidden without the written consent of Peugeot Motocycles
Removal of the RH and LH radiators.
- Remove the mudguard (see procedure 4).
- Disconnect the lower pump from the coolant
pump to drain the cooling system.
- Disconnect the pipes (1) from the RH and LH
radiator.
- Remove the RH or LH radiator.
All the collar opening tabs are to be oriented upwards.
Removal of the cylinder / piston.
- Remove the footboard (see procedure 6).
- Remove the exhaust.
- Disconnect the lower pump from the coolant
pump to drain the cooling system.
- Disconnect the coolant pipes from the cylinder
head and cylinder.
- Disconnect the temperature sensor.
For removal of the cylinder head, cylinder and piston, see the workshop manual.
1
1
Summary of Contents for BLASTER
Page 1: ...Sales division Technical network leadership WORKSHOP MANUAL ...
Page 23: ......