SERVICE OPERATIONS
28
Reproduction ou traduction, même partielle, interdite sans autorisation écrite de Peugeot Motocycles
Draining the cooling circuit
- Remove the storage compartment. See:
Procedure 1. page 18.
- Remove the header tank cap.
- Disconnect the lower pump from the coolant
pump to drain the cooling system. (1)
Note: The cooling system is drained when
the engine is cold.
- Connect the lower hose to the water pump
- Fill the circuit with 1.3 L of coolant.
- Loosen the bleeder screw (2) to remove air
contained in the engine.
- Close the bleeder screw.
Tightening torque: 0.3 m.daN.
- Start the engine and accelerate in order to
warm it up.
- Stop the engine once it reaches its operating
temperature. (Approximately 90°C).
- Check the coolant level in the header tank.
- If necessary add coolant in the header tank.
A. Maximum level.
B. Minimum level.
Note: Check the level with the machine par-
ked on its centre stand, on level
ground.
1
2
B
A
Summary of Contents for Geopolis 250
Page 1: ...Direction commerciale Animation technique réseau WORKSHOP MANUAL ...
Page 50: ......
Page 51: ......