background image

April 2019

8

Translation of original operating manual for lifting points PLZW pewag winner profilift zeta

pewag austria GmbH

A-8041 Graz, Gaslaternenweg 4, Phone: +43 (0) 50 50 11-0, Fax: +43 (0) 50 50 11-100
saleinfo@pewag.com, 

www.pewag.com

Technical changes and misprints excepted.

B

G/00126

Declaration of conformity

pewag austria GmbH,

 Mariazeller Straße 143, 8605 Kapfenberg

Stefan Duller

General Manager

Translation of original 
declaration of conformity

as defined by EC directive 2006/42/EC, Annex II A

Kapfenberg, 01-01-2019

We,

pewag austria GmbH, A-8605 Kapfenberg, Mariazellerstraße 143a

declare herewith that the product

PLZW pewag winner profilift zeta lifting point

complies with all the provisions of the EC machinery directive 2006/42/EC.

Applied harmonized standards in particular:

EN 1677-1: Components for slings-safety – part 1: 
Forged steel components but mechanical values acc. to pewag internal standard

EN ISO 12100: Safety of machinery. General principles for design. 
Risk assessment and risk reduction

Other applied technical standards and specifications:

DGUV GS OA 15-04: Principles of testing and certification of lifting points

Authorized person for the configuration of the declaration documents:

Ranko Ivanic, pewag austria GmbH, A-8605 Kapfenberg, Mariazellerstraße 143a

Summary of Contents for PLZW

Page 1: ...or users together with the product This product as well as the operating manual may only be sold in countries where English is the national language This operating manual is subject to an ongoing impr...

Page 2: ...fied in point 2 this manual This product may not be used for the lifting or securing of persons 2 Designated use Purpose The pewag PLZW is a lifting point that is screwed onto loads so that lifting ch...

Page 3: ...while under load The information contained in this operating manual is based on the assumption that no particularly hazardous conditions apply Such conditions include offshore use and use in areas wi...

Page 4: ...ensure that the load has been lowered safely before removing the lifting device Do not overload lifting points Falling loads may cause injury and or death 3 3 Remaining risks Overloading caused by non...

Page 5: ...facing downwards and position the ring on top as shown in the image the nubs on the ring are positioned on each side of the sleeve C Place the ring holder onto the sleeve so that the nubs of the ring...

Page 6: ...ct surface must fully rest on the load after the lifting point has been screwed in The ring of the lifting point used must be aligned with the expected load direction Regular inspection Regular inspec...

Page 7: ...ong shocks Reduction factor 1 0 7 Not permitted Table 3 Straight pull 0 Lateral load direction permitted ring is aligned 90 Lateral load direction not permitted ring is not aligned Higher load capacit...

Page 8: ...mbH A 8605 Kapfenberg Mariazellerstra e 143a declare herewith that the product PLZW pewag winner profilift zeta lifting point complies with all the provisions of the EC machinery directive 2006 42 EC...

Reviews: