Preparation
9 - 1
9
Preparation
All regulations and instructions in this Instruction Manual are to be observed!
Special attention is to be paid to the safety regulations!
All preparation work is only to be carried out by appropriately trained personnel.
Before all preparation work, the machine is to be separated from the electricity
supply by removing the plug from the mains or switching off the On/Off
switch!
9
.01
Inserting the needle
Switch off the machine!
Danger of injury due to
unintentional starting of the
machine!
Only use needles from the
system intended for the
machine, see
Chapter 3
Specifications.
●
By turning the balance wheel, bring the
needle bar to its t.d.c.
●
Loosen screw
1
.
●
Insert the needle as far as possible.
●
The long needle groove must be facing
forwards.
●
Tighten screw
1.
Fig. 9 - 01
1
9
.02
Threading the needle thread
Switch off the machine!
Danger of injury if the machine starts accidentally!
●
Thread the needle thread as shown in the corresponding diagram (see next page).
●
Adjust the relevant needle thread tension by turning milled nuts
1.
1