English
Wall-Mounted Wire Rope Winch SW W-SGG
with enclosed worm gear pair
F04.02.063
design changes under reserve
page 8
Before taking into operation, please carefully
read this operating instructions!
Observe the safety instructions!
File documentation!
Destined use
The wall mounted winch with worm gearing is a
manually operated winch fixed to the wall for lifting
and lowering of loads.
Not suitable for use in explosive danger area.
Not suitable for use in corrosive atmosphere.
Power operation is not allowed.
The winch is not designed for continuous
operation.
Alterations to the winch or fitting of ac-
cessories are only allowed with our written
approval.
Pay attention to the technical data and functional
description!
Regulations for the Prevention of Ac-
cidents
Observe any rules which are valid for the respective
country.
1)
Presently valid in Germany:
BGV D8 winches- lifting and pulling devices
BGR 500 – 2.8 load suspension devices in hoist
operation
DIN 15020 page 1 and page 2
EC directive 98/37/EC
FEM 9.661 ISO 4308/1
1) in the respective version
Safety Instructions
Operation, installation and maintenance work
should only be executed by personnel who are:
Competent, qualified persons
(definition of experts acc. to IEC 364)
Qualified persons for reasons of their training, experience and
instruction are persons who do their necessary activities
without danger and who can avoid this danger due to their
knowledge of directives, regulations for the prevention of
accidents and standards. These persons are responsible for
the security of the installation.
Moving of people by the winch or of loads over
people is strictly forbidden.
Never touch moving parts.
Defects must be repaired immediately by competent
trained personnel.
The load
Ö
must not be left suspended without supervision,
Ö
must not be allowed to swing
Ö
must not fall into the wire rope
The rope
Ö
should only be used for lifting,
lowering or pulling of various loads
and must not be used for any other
purpose.
Ö
in lowest position at least 3 full
turns of rope should remain on the
drum when loaded.
Ö
max. fleet angle 3° (see picture)
Ö
when filled to its capacity the drum
flanges must project not less than
1.5 times the diameter of the rope.
Ö
examine and service regularly acc.
to DIN 15020 page 2
Ö
only handle with safety gloves
Ö
do not touch the rope inlet
The Winch
Do not exceed the capacity of each rope layer.
Before taking into operation, a competent person
must check:
Ö
the lifting device
Ö
the load bearing parts of the structure
Ö
the carrying medium
Ö
mounting
Daily examinations:
Ö
brake functions
Ö
condition of the rope and loading device
Ö
load bearing parts of the structure.
Ö
the load carrying medium
Load attachment device:
Ö
check it has sufficient carrying capacity
Ö
load hooks must have safety catches.
Ö
load hooks must be secured to the rope with a
solid eye and high pressure rope clamp and
tested according to the regulations
Ö
fix the load correctly
Ö
do not use the winch rope as a hitching device.
The winch should be given a thorough
examination by a competent person at least
once a year.
Always ensure the maintenance intervals are
adhered to.
Only use original accessories and spare parts;
otherwise safe function is not guaranteed.
!
1,5°
3°
1,5°
3. 2. 1.
3°