CAYMAN Part 2 Overview – Operation - Spare parts lists
Material:
22
2017-03-22
15 Material:
15.1 Flowability / Flow characteristic
NOTE!
The pump unit can be used up to 25 bar operating pressure.
The possible conveying distance depends mainly on the flowability of the material.
If 25 bar operating pressure are exceeded the mortar hose length has to be reduced.
In order to avoid machine faults and increased wear of the pump motor and the pump itself,
only original PFT spare parts such as
PFT rotors
PFT stators
PFT mortar hoses must be used.
These are compatible with each other and form a constructive unit with the machine.
Non-compliance does not only cause loss of guarantee, but also bad mortar quality is to be
expected.
16 Mortar pressure gauge
Caution!
The use of a mortar pressure gauge is
recommended for safety-related reasons.
Fig. 16: Mortar pressure gauge
PFT mortar pressure gauge
Some advantages of the mortar pressure gauge:
Exact adjustment of the correct mortar consistency.
Constant control of the right conveying pressure.
Early detection of clogging or overload of the pump motor.
Relieving pressure.
Long service life of the PFT pump parts.
Is a major contribution to the safety of the operators.
17 Safety rules
Caution!
Observe the regional safety rules for mortar
conveyors and mortar guns!
Summary of Contents for 00 24 88 94
Page 83: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 83 ...
Page 84: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 84 2017 03 22 ...
Page 85: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 85 ...
Page 86: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 86 2017 03 22 ...
Page 87: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 87 ...
Page 88: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 88 2017 03 22 ...
Page 89: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 89 ...
Page 90: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 90 2017 03 22 ...
Page 91: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 91 ...
Page 93: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 93 ...
Page 94: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 94 2017 03 22 ...
Page 95: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 95 ...
Page 99: ...CAYMAN Part 2 Overview Operation Spare parts lists 2017 03 22 99 ...