CAYMAN Part 2 Overview – Operation - Spare parts lists
Machine preparation
2017-03-22
27
21 Machine preparation
21.1 Positioning machine
Prior to operating the machine carry out the following steps for
preparing the machine:
1
Fig.
20: Risk of injury
DANGER!
Rotating metering and pump shaft.
Risk of injury while reaching into the material
container.
Therefore:
During machine preparation and operation, the
protective grids (1) must not be removed.
Never reach into the running machine.
Fig.
21: Lockable castor
Put up the PFT CAYMAN on a stable, even surface and secure
against unwanted movements:
Put up the machine in such a way that it cannot be hit by falling
objects.
Lock the castors (2) of the machine.
The operating elements have to be freely accessible.
21.2 Pull pump unit from chassis
Fig. 22: Open turning bolts
Fig. 23: Pump unit
1. Open turning bolts (1) and (2) on both the
sides.
2. Pull the pump unit (3) from the chassis.
3. Close turning bolt (2).
2
2 3
1
Summary of Contents for 00 24 88 94
Page 83: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 83 ...
Page 84: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 84 2017 03 22 ...
Page 85: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 85 ...
Page 86: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 86 2017 03 22 ...
Page 87: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 87 ...
Page 88: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 88 2017 03 22 ...
Page 89: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 89 ...
Page 90: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 90 2017 03 22 ...
Page 91: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 91 ...
Page 93: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 93 ...
Page 94: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 94 2017 03 22 ...
Page 95: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 95 ...
Page 99: ...CAYMAN Part 2 Overview Operation Spare parts lists 2017 03 22 99 ...