CAYMAN Part 2 Overview – Operation - Spare parts lists
Rest
2017-03-22
45
35.6 Blockage cannot be cleared
Fig.
60: Loosen coupling
NOTE!
Mortar hoses are cleaned immediately.
1. Cover coupling connections with tear-proof film.
2. Loosen cam leaver and hose connections.
3. Dislodge the blockage by tapping or shaking at the place where the
blockage is located.
4. If required, insert a rinsing hose into the mortar hose and flush out the
material (PFT rinsing hose art. no. 00113856).
5. Wash in mortar hoses again.
Fig. 61: Mortar pressure gauge
DANGER!
Overpressure on the machine!
When opening machine parts they can open in an
uncontrolled manner and injure the operator.
– Open the mortar hoses only when the pressure has
dropped to "0" bar.
35.7 Interruption in conveying
NOTE!
Avoid interruptions in conveying over a longer time as far
as possible.
36 Rest
Fig.
62: Switching off
NOTE!
Always observe the setting time of the material to be
processed and the external temperatures.
Clean the system and mortar hoses depending on the setting time of the
material.
Summary of Contents for 00 24 88 94
Page 83: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 83 ...
Page 84: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 84 2017 03 22 ...
Page 85: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 85 ...
Page 86: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 86 2017 03 22 ...
Page 87: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 87 ...
Page 88: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 88 2017 03 22 ...
Page 89: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 89 ...
Page 90: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 90 2017 03 22 ...
Page 91: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 91 ...
Page 93: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 93 ...
Page 94: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 94 2017 03 22 ...
Page 95: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 95 ...
Page 99: ...CAYMAN Part 2 Overview Operation Spare parts lists 2017 03 22 99 ...