CAYMAN Part 2 Overview – Operation - Spare parts lists
End of work / clean machine
46
2017-03-22
37 End of work / clean machine
37.1 Secure against restarting
DANGER!
Danger to life from unauthorised restarting!
When working with the machine there is the risk
that the energy supply is switched on without
authorisation. This poses a danger to life for the
persons in danger area.
– Switch off all energy supplies before starting
any work and secure against restarting.
37.2 Empty the machine FU Machine:
Fig.
63: Run the machine empty
The machine has to be cleaned daily.
In addition, before end of work:
1. Turn the selector switch (1) to position “6” (empty the mixer).
2. The mixer conveys material in the pump container till the pilot
lamp “No Material” lights up.
3. The machine switches off on its own.
NOTE!
Never let the pump run dry as this reduces the
service life of the pump.
37.3 Disconnect the mortar hoses
1
Fig. 64: Mortar pressure to "0” bar.
1. Check the mortar pressure gauge if the mortar pressure has
lowered to "0" bar.
2. Change the direction of rotation of the pump motor is required.
See chapter 22.1
DANGER!
Overpressure on the machine!
When opening machine parts they can open in an
uncontrolled manner and injure the operator.
Therefore:
– Open the mortar hoses only when the pressure
has dropped to "0" bar.
3. Loosen the cam lever (1) and disconnect the mortar hose from
the pressure flange.
1
Summary of Contents for 00 24 88 94
Page 83: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 83 ...
Page 84: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 84 2017 03 22 ...
Page 85: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 85 ...
Page 86: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 86 2017 03 22 ...
Page 87: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 87 ...
Page 88: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 88 2017 03 22 ...
Page 89: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 89 ...
Page 90: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 90 2017 03 22 ...
Page 91: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 91 ...
Page 93: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 93 ...
Page 94: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 94 2017 03 22 ...
Page 95: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 95 ...
Page 99: ...CAYMAN Part 2 Overview Operation Spare parts lists 2017 03 22 99 ...