CAYMAN Part 2 Overview – Operation - Spare parts lists
Maintenance
52
2017-03-22
Secure against restarting
DANGER!
Danger to life from unauthorised restarting!
When working with the tool, there is the risk that the
energy supply is switched on without authorisation.
This poses a danger to life for the persons in danger
area.
– Switch off all energy supplies before starting any
work and secure against restarting.
NOTE!
Maintenance of the CAYMAN is limited to a few
checks. Thorough cleaning of the machine is the
most important maintenance.
41.1 Adjust clamping of pump
Fig.
83: Stator can be retightened
1. The CAYMAN is equipped with a pump system that can be
retightened.
2. If the pumping pressure decreases, the stator can be adjusted.
3. The supply pressure is approx. 20 – 25 bar.
4. Do not adjust the pump during operation.
5. The lesser the voltage of the spiral casing, the lesser is the
wear of the spiral pump.
41.2 Change pump
Fig.
84: Change pump
Pump parts that do not achieve the required pumping pressure
when clamped, have to be replaced:
When changing the pump it has to be ensured that
all screws of the clamp are tightened uniformly.
NOTE!
Assembled pump (rotor in stator) are stored for a
few days only as rotor and stator can get connected
inseparably in case of prolonged storage.
Summary of Contents for 00 24 88 94
Page 83: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 83 ...
Page 84: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 84 2017 03 22 ...
Page 85: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 85 ...
Page 86: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 86 2017 03 22 ...
Page 87: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 87 ...
Page 88: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 88 2017 03 22 ...
Page 89: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 89 ...
Page 90: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 90 2017 03 22 ...
Page 91: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 91 ...
Page 93: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 93 ...
Page 94: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 94 2017 03 22 ...
Page 95: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 95 ...
Page 99: ...CAYMAN Part 2 Overview Operation Spare parts lists 2017 03 22 99 ...