41.9 Actions after completed maintenance
After finishing the maintenance works and prior to switching on the
machine, the following steps have to be carried out:
1.
Check all previously loosened screw connections for secure
fit.
2.
Check if all previously removed safety systems and covers are
properly reinstalled.
3.
Ensure that all used tools, materials and other equipment
were removed from the work area.
4.
Clean the work area and remove any spilled materials such as
liquids, processing material or similar.
5.
Ensure that all safety systems of the installation work
perfectly.
42 Disassembly
After the useful service life has been reached, the device has to be
dismantled and disposed of in an environmental-friendly manner.
42.1 Safety
Personnel
Disassembly must be carried out only by specially trained
technical personnel.
Work on the electrical system must be carried out by qualified
electricians only.
Basic information
WARNING!
Risk of injury in case of improper disassembly!
Stored residual energies, sharp components,
points or edges at and inside the device or at the
required tools might cause injuries.
– Prior to starting the works ensure that there is
sufficient space.
– Carefully handle components with sharp edges.
– Ensure order and cleanliness at the working
place! Loose components and tools on top of
one another or lying about pose potential
accident risks.
– Dismantle components correctly. Pay attention
to partly high dead weight of the components. If
required use lifting equipment.
– Secure components that they do not fall down
or fall over.
– In case of doubt, consult the dealer.
Summary of Contents for 00 24 88 94
Page 83: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 83 ...
Page 84: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 84 2017 03 22 ...
Page 85: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 85 ...
Page 86: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 86 2017 03 22 ...
Page 87: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 87 ...
Page 88: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 88 2017 03 22 ...
Page 89: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 89 ...
Page 90: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 90 2017 03 22 ...
Page 91: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 91 ...
Page 93: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 93 ...
Page 94: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 94 2017 03 22 ...
Page 95: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 95 ...
Page 99: ...CAYMAN Part 2 Overview Operation Spare parts lists 2017 03 22 99 ...