PFT ZP 3 L MULTIMIX Overview – Operation – Spare Parts Lists
Checking the direction of rotation of the ZP 3 L
2016-07-04
27
26.1 Checking the direction of rotation of the R7-3S
Fig. 32: Checking the direction of rotation
1. The pump unit 2L6 rotates to the right when viewed from the
mortal pressure gauge.
26.2 Switching on the ZP 3 L
1
2
3
Fig. 33: Switching on the ZP 3 L
1. Close the control circuit by inserting the dummy plug (1) in the
control box.
2. Turn the main reversing switch (2) on the control box to the “I”
position.
3. Press the green push button (3) to switch the control voltage
“ON”.
26.3 Changing the direction of rotation
1
2
Fig. 34: Switching on the MULTIMIX
NOTE!
If the direction of rotation is incorrect:
The main reversing switch is locked in the zero
position by pushing the selection switch (1) to the left
or right. This defines the direction of rotation. If the
switch is set to the left, the switch can be reset to zero
but is blocked for the right-side position.
1. Switch off the control voltage to the ZP 3 L again at the red
push button (2).
26.4 Draining residual water
Fig. 35: Opening the cleaning nozzles
1. Remove the cover (1) from the cleaning nozzles and drain any
water remaining in the material hopper.
1