PFT ZP 3 L MULTIMIX Overview – Operation – Spare Parts Lists
Cleaning
2016-07-04
43
Fig. 67: Open the cleaning cover
1. At the end of work, run the ZP 3 L empty.
2. Clean residual material from the protective grille and material
hopper with a water jet and pump it down.
3. Fill material hopper with water and switch on the machine so
that the pump is rinsed with water.
4. Remove the cleaning cover (1) and allow the residual water to
drain.
37.3 Checking the mortar pressure
Fig. 68: Mortar pressure at 0 bar
Before disconnecting the mortar hoses, check the mortar
pressure gauge (1) to see if the pressure has fallen to “0 bar”.
DANGER!
Overpressure on the machine!
When opening machine components, these can
fly open in an uncontrolled manner and injure the
operator.
Only open the mortar hoses if the pressure has
fallen to “0 bar”.
Wear protective clothing and goggles.
Fig. 69: Detaching connections
Release the cam lever and disconnect the material hoses.
NOTE!
The mortar hoses and spray gun must be cleaned
immediately at the end of work.
37.4 Cleaning the mortar hose
NOTE!
Residual material setting on the interior of the
mortar hose can cause damage that only continues
to build, narrowing the cross section. Clean mortar
hoses are therefore imperative for problem-free
pumping the next time they are used.
1
1