Mixing pump G 4 X FU 230/400V / Part 2 Overview, operation and service
Operation
After the rescue operations
WARNING
Danger to life from premature reactivation!
On reactivation there is danger to life for all persons in the
danger zone.
Ensure that the danger zone is clear before switching
the machine back on.
Check the system before reactivation and ensure that
all safety equipment is installed and functional.
9. Check the system before reactivation and ensure that all safety
equipment is installed and functional.
5.5
Putting the machine into operation
5.5.1
Checking the mortar consistency
Figure 57: Consistency inspection tube
1. Connect consistency inspection tube to the mortar pressure gauge.
2. Place a bucket or tray below the consistency inspection tube.
Mortar consistency inspection tube 25M
Item no. 20104301
5.5.2
Feeding material to the machine
1
3
5
2
4
Figure 58: Switching on the machine
1. Turn the main reversing switch (1) to position "I".
2. Press the green pushbutton (2) control voltage "ON".
3. Turn the booster pump selector switch (3) to the "AUTO" position.
4. Turn the star wheel selector switch (4) to the "1" position.
5. Turn the pump motor selector switch (5) to "right" position.
The machine starts.
page 45 / 80
Summary of Contents for 00260621
Page 77: ...Mixing pump G 4 X FU 230 400V Part 2 Overview operation and service Disposal page 77 80...
Page 78: ...Mixing pump G 4 X FU 230 400V Part 2 Overview operation and service Disposal page 78 80...
Page 79: ...Mixing pump G 4 X FU 230 400V Part 2 Overview operation and service Disposal page 79 80...