Container Mixing
Pump CMP 30 4.0
Part 2: Overview –
Operation – Spare Part Lists
Transport, packaging and storage
22
2021-02-10
16.2 Transport checklist
Inspect the goods for damage and missing parts immediately
after delivery.
If external transportation damage can be seen, proceed as follows:
Do not accept the delivery, or accept it only under reservations.
Note the damage on the transportation documents or
the delivery note of the carrier.
Submit the appropriate claim.
NOTE!
Always submit a claim for the defects as soon
as they are detected.
16.3 Transport by car or truck
DANGER!
Risk injury due to unsecured load!
All persons involved in the loading are responsible
for securing the load properly during road
transport. The relevant vehicle driver is
responsible for the operational loading.
Fig. 20:
Truck transport
NOTE!
Truck transport:
Pay attention before each journey:
Close the switch cabinet door.
Secure the cleaning hose with a strap.
Connect the water hose to the mixing tube.
Secure or remove loose parts.
Pump material container must be completely
empty and clean.
Check for loose bolts or nuts.
16.4 Transport
Fig. 21:
Pump unit
Check the tie rods for strength.
1