FERRO 100 II Part 2 Overview – Operation - Spare parts lists
Transport, packing and storage
22
2018-03-26
16.2
Transport inspection
On receipt check the delivery immediately for completeness and
transport damage.
In case of externally visible transport damage, proceed as follows:
Do not accept the delivery or under reserve only.
Note the extent of damage on the transport documentation or
on the delivery note of the carrier.
Initiate complaint process.
NOTE!
Report any defect as soon as it is detected. Claims
for damages can be asserted only within the valid
warranty period.
Anchor points
Fig. 18: Crane transport
Anchor the machine at the anchor points for transport by crane.
Observe the following conditions:
The crane and lifting equipment have to be designed for the
weight of the packages.
The operator has to be authorised to operate the crane.
Attachment:
Anchor the hooks to both crane hooks accordingly.
Ensure that the package is straight, possibly observe eccentric
centre of gravity.
In case of transport by crane, remove the loose parts.
16.3
Transport safety
Fig. 19:
Transport safety
Important!
Risk of injury due to unsecured load!
Before starting transport, make sure that:
the machine is fixed to the silo by the chains..
none of the chains, clamps or screws are
damaged.
all chains are evenly tensioned.