FERRO 100 II Part 2 Overview – Operation - Spare parts lists
Table of Contents
4
2018-03-26
Work on troubleshooting .......................... 34
Reaction in the event of faults ........... 34
Fault displays ..................................... 35
Faults ................................................. 35
Safety ................................................. 35
Table of faults .................................... 36
Transport is at a standstill /
Blockage ............................................ 39
Removal of clogging in hoses /
Signs of blockages ............................. 39
Causes for this could be: ................... 39
Prior damage of the material hose..... 39
Change direction of rotation of the
hoses ................................................. 40
Detach coupling connections ............. 41
Interruption in conveying .................... 41
Rest.............................................................. 41
Cleaning ...................................................... 41
Run the machine empty ..................... 41
Remove the material hoses ............... 42
Clean material hoses immediately ..... 42
Cleaning the mixer ..................................... 43
Safety shutdown at the mixing tube ... 43
container ..................................................... 43
Action in case of power failure ................. 45
Measures to be taken in case of water
outage.......................................................... 45
Measures in case of risk of frost .............. 45
Remove the water hose ..................... 45
Maintenance ............................................... 46
Adjust pump ....................................... 47
Change pump .................................... 47
Tightening torque of tie rod screws .... 48
Do not load the pump unit .. 48
Replace the pump motor ................... 48
Do not load pump motor .................... 48
Lubrication during maintenance ......... 49
Cleaning filters ................................... 49
Environmental protection ................... 50
maintenance ...................................... 50
Refilling the silo ......................................... 51
Disassembly ............................................... 51
Safety ................................................ 51
Disassembly ...................................... 52
Disposal ...................................................... 52
Spare parts drawing, spare parts list ...... 54
Mixer motor / dosing shaft ................. 54
Star wheel lock FERRO II complete .. 55
Dosing tube FERRO II ....................... 55
Mixing tube FERRO II........................ 56
Mixing tube FERRO II “ALT” ............. 57
Mixing tube FERRO II “NEW” ............ 58
Pump container ................................. 59
Oil sealing unit FERRO II .................. 60
Pump unit FERRO II .......................... 61
00186555 ........................................... 62
FERRO 100 II 00186555 ................... 63
00186555 ........................................... 64
FERRO 100 II 00186555 ................... 65
00232147 ........................................... 66
FERRO 100 II 00232147 ................... 67
00232147 ........................................... 68
FERRO 100 II 00232147 ................... 69
Control box Art. no. 00178685 /
00208092 ........................................... 70
Control box Art. no. 00178685 /
00208092 ........................................... 72
number 00178685 internal ................ 74