FERRO 100 II Part 2 Overview – Operation - Spare parts lists
Preparation
28
2018-03-26
Fig. 26:
Check the connections
All the connections should be made or checked before
commissioning:
Connect the power supply for pump motor (4).
Connection dry sensor (5)
Connection thermistor (6)
Connection wet sensor (7)
Fig. 27: Connecting remote control
To set the water factor and the machine, use the dummy connector
(8).
21.2
Connecting the water supply
Fig. 28: Water connection
Connect to water supply with 3/4” hose.
The water supply line must first be rinsed to vent the hose line
and to clean it of contaminations.
Connect the water hose to the water inlet (1).
If the flow pressure is not adequate (at least 2.5 bar in running
machine), either a second supply can be put in or it can be
operated using a collection tank (water tank).
21.3
Connecting the water supply to the water tank
Fig. 29: Water tank
Connect the water hose to the water tank (1).
21.4
Pre-setting the water flow rate
Fig. 30: Remove the water hose
Remove the water hose (1) from the mixing tube.
4
5
6
7
8
1
1
1