____________________________________________________________________________________________________________
PFT G 5 c FU 230
16
Initial Start
01.2005
____________________________________________________________________________________________________________
________________________________________________________________________________________
Knauf PFT GmbH & Co. KG
Telephone
09323 / 31-760
PO Box 60
Telefax
09323 / 31-770
D-97343 Iphofen
Internet
www.pft.de
________________________________________________________________________________________
Connect control box to power supply
Now the following steps must be carried out:
Turn on the main switch
Warning!
The protective grille must not be removed during operation or while preparing the
machine.
Press water flow button (1) (water pump runs), adjust estimated water quantity at the
needle valve (2).
Connect water hose of water flow meter to upper water inlet of the mixing tube.
Press water flow button briefly. On starting, there must be a sufficient quantity of
water in the mixing area so that the rotor head is covered (check for leaks, screw
pump might be defective).
Check water level (can be done with tilted pump motor).
1
2