____________________________________________________________________________________________________________
PFT G 5 c FU 230
3
PFT Sales Information
01.2005
____________________________________________________________________________________________________________
________________________________________________________________________________________
Knauf PFT GmbH & Co. KG
Telephone
09323 / 31-760
PO Box 60
Telefax
09323 / 31-770
D-97343 Iphofen
Internet
www.pft.de
________________________________________________________________________________________
Initial inspection after delivery
An indispensable task of all technicians delivering the PFT G 5 c FU 230 mixing pump
is the inspection of the machine settings at the end of the first spraying phase. The
factory settings can be changed during the first operation. If these changes are not
corrected in time, immediately after initial start-up, then operating trouble can be
expected.
After putting the PFT G 5 c FU 230 mixing pump into service and giving appropriate
instructions, after about two hours, the technician must always carry out the following
checks / make the following settings:
1.
Water safety switch
2.
Pump pressure, backpressure
3.
Pressure relief valve on compressor
4.
Air nozzle tube clearance (spray pattern)
5.
Air safety switch
6.
Compressor safety switch
7.
Remote control switch
8.
Pressure reducer
9.
Motor protection switch