PFT G 5 SUPER
Operating Manual
Issued 11.2008
Knauf PFT GmbH & Co.KG
29
Procedures at the End of Work and Cleaning
WARNING!
Before dismantling the rotor/stator pump or opening the motor flange make
sure the pump and hoses are depressurized.
Watch the reading on the mortar pressure gauge.
At the end of the spraying operation switch off material supply (star wheel)
and turn star wheel switch to O (1).
Empty mixing tube.
Press red button (off) (2).
Switch off compressor (3) and the tap on spraying gun.
Remove plug on CADDY!
Disconnect mortar hose (only when depressurized).
To clean, connect the hoses (including the mortar pressure gauge)to the
water inlet valve with the help of the transition adaptor (in tool kit). This
reduces wear and tear on the pump. A water-soaked sponge should first be
pressed into the hose inlet.
Open the water valve until the sponge ball comes out of the hose.
To clean hoses with varying diameters, use sponge balls of appropriate
sizes.
If hoses are heavily soiled, repeat this process until hoses are clean.
Clean the spraying gun with running water.
Undo snaps on motor flange (1) and tilt motor.
Remove mixing shaft (2) and clean it.
Clean mixing zone with trowel.
1
2
1
2
3
Summary of Contents for G 5 SUPER
Page 48: ...PFT G 5 SUPER Operating Manual Issued 11 2008 Knauf PFT GmbH Co KG 48...
Page 58: ...PFT G 5 SUPER Operating Manual Issued 11 2008 Knauf PFT GmbH Co KG 58 Circuit Diagramm...
Page 59: ...PFT G 5 SUPER Operating Manual Issued 11 2008 Knauf PFT GmbH Co KG 59 Circuit Diagramm...
Page 60: ...PFT G 5 SUPER Operating Manual Issued 11 2008 Knauf PFT GmbH Co KG 60 Circuit Diagramm...
Page 61: ...PFT G 5 SUPER Operating Manual Issued 11 2008 Knauf PFT GmbH Co KG 61 Circuit Diagramm...
Page 63: ...PFT G 5 SUPER Operating Manual Issued 11 2008 Knauf PFT GmbH Co KG 63 Notes...